TR Navy Navy|News & Discussions

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,720
Solutions
2
Reactions
138 26,368
Nation of residence
Turkey
Nation of origin
Turkey
I believe MKE has been building these fuzes for a long time, most our ships had a similar capability for years for 76 and 127mm. What Strales adds is the radar and the faster rate of fire.
I thought MKE was only making the HE type of 76/62 rounds without the proximity fuse. The picture is from TCG Istanbul which is equipped with Super Rapid. The munition shown could also have been delivered with the gun from Leonardo
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,720
Solutions
2
Reactions
138 26,368
Nation of residence
Turkey
Nation of origin
Turkey
According to Akbaba their will be a additional order for 4 istifs.
Source: His arse.

Current Tepe-Class acquisition surpasses a billion dollars, suffice to say well above. The first 4 orders most definitely will be full package consisting of Planar array Triband AESA ESM suite, Full CAFRAD suite, 96 VLS.

However, I am ascertain that the later block will be downgraded to serve as multi-purpose frigate and won't be referred as "Tepe Class". Costing nearly half, 6-8 of these will be procured.

And there will be a final block which will be procured after the multi purpose frigate, and it will be something else, possibly 2 or 3 of these dedicated to BMD.

Source: my arse, nevertheless.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,720
Solutions
2
Reactions
138 26,368
Nation of residence
Turkey
Nation of origin
Turkey
So,when two are sold only two more Istif class?
There are few ships in the inventory, seeming that can't keep up beyond 2030s, at least two of this "rumored" orders are for Turkish Navy.

Also we shall consider this in conjunction with TF-2000 procurement. The very same shipyards of TAIS consortium will be building TF-2000, on in each. 4 more I-Class also means another 2 years, which delays +3 TF-2000 by another two years, beyond 2030 to start construction.
 

Pokemonte13

Contributor
Messages
579
Reactions
11 1,039
Nation of residence
Germany
Nation of origin
Turkey
I think they would first order the replacement for the sold ships and the extra maybe after the 3 tf2000. But overall I don’t expect any more orders for tf2000 before 2029 but I would welcome 10 istifs for our navy.
 

TR_123456

Experienced member
Staff member
Administrator
Messages
6,208
Reactions
1 15,743
Nation of residence
Nethelands
Nation of origin
Turkey
There are few ships in the inventory, seeming that can't keep up beyond 2030s, at least two of this "rumored" orders are for Turkish Navy.

Also we shall consider this in conjunction with TF-2000 procurement. The very same shipyards of TAIS consortium will be building TF-2000, on in each. 4 more I-Class also means another 2 years, which delays +3 TF-2000 by another two years, beyond 2030 to start construction.
Any news on a ''inbetween'' class?
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
3,805
Reactions
118 17,335
Nation of residence
Turkey
Nation of origin
Turkey
Any news on a ''inbetween'' class?
Nothing new so far afaik.

But this would be the said in-between class if it happens:
However, I am ascertain that the later block will be downgraded to serve as multi-purpose frigate and won't be referred as "Tepe Class". Costing nearly half, 6-8 of these will be procured.
Downgrading the sensors and lowering VLS count to 48-64 on the Tepe and converting them to a multi purpose frigate at 5-6ktons would be cheaper than a new design.
--
Current Tepe-Class acquisition surpasses a billion dollars, suffice to say well above.
Single ship? We always knew it would be expensive; but damn.
 
Top Bottom