I agree with your second paragraph fully. My only addition would be the introduction of a EJ200 engine as an alternative. Since ITP of Spain has been instrumental in the development of a single engined and TVC version of this engine, it could be an alternative to F404. But it would still delay the serial production.@Yasar_TR
If the F110 engines cannot be procured, I believe we will have to resort to a rather risky course of action. That risky course is this: Delivering the Block 10 Kaans using immature TF35000 engines, which offer F110 thrust values. This would save the Kaan program from a complete collapse.
Even then, by my estimate, the Kaan program would be delayed by approximately two years. The first Kaans would be delivered in 2030, not 2028, at the best.
----------------------------------------------------------------------------------------------------------------------
However, if the F404 engines cannot be procured, the Hürjet program would certainly collapse. Because, a) There is no money or manpower to redesign the aircraft, as Temel Kotil has said; and b) Developing a new engine would take 10 years, at the best!
-----------------------------------------------------------------------------------------------------------------------
I believe the USA will not finalize the F404 procurement until the fate of the Boeing T7 is clear. If T7 fails, i believe USA will deliver the F404s. Because in that case, the USA will also need Hürjet. I cannot predict what the USA will do regarding the F110. If the T7 doesn't fail, will the US deliver the F404s? Just like with the F110s, I can't predict that.
Regarding your last paragraph; although logical, US intends to sell 2000 of these trainers world wide. T7 is not supersonic and comparatively cheap. They have done nothing to hinder S Korea’s TA50 production which is similar to Hurjet. Unless they have a special animosity towards us, I can’t see them stopping delivery of these engines because of competition. But more likely will try to throw a spanner in the works supported by anti Turkiye lobbies in US administration.
Regarding your first paragraph; When it comes to the stage that KAAN B10s are going to be without engines, they will push TEI to deliver engines that can fly the plane even before the engine is fully matured. But with respect to thrust levels; the real issue still is not the thrust levels but the durability of parts. Before thrust levels this is the main area TEI will concentrate in the development stages. So first engines may not last as long as desired. But will gradually get to acceptable levels. (Remember Chinese WS10 lasting 250 hours then 500hours. Now they claim a life expectancy of 1000 to 1500 hours)