TR Air-Force TF-X KAAN Fighter Jet

IC3M@N FX

Contributor
Messages
539
Reactions
3 25 1,081
Nation of residence
Germany
Nation of origin
Turkey
When will they finally present the next prototype? It can't be rocket science.
Almost a year has passed now; they need to get a move on.
We need 50-60x Ugraded F-16 Özgur II, 24x Eurofighter and 10x TAI KAAN & Kizilelma + Anka 3 Aircraft (Total 30) by 2029/30 to send a signal to the outside world (Greece/Israel und Russia).
 

AlperTunga

Active member
Messages
132
Reactions
2 150
Nation of residence
Switzerland
Nation of origin
Turkey
When will they finally present the next prototype? It can't be rocket science.
Almost a year has passed now; they need to get a move on.
We need 50-60x Ugraded F-16 Özgur II, 24x Eurofighter and 10x TAI KAAN & Kizilelma + Anka 3 Aircraft (Total 30) by 2029/30 to send a signal to the outside world (Greece/Israel und Russia).
This should be at a minimum, and I'd like to challenge the number 50-60 F16 ÖZGÜR II. If our MURAD radar and other electronics, sensors etc. have reached a certain maturity such that we can begin integrating them serially to our F16s, what is preventing us to integrate them to 200 F16s? Is it a cost issue? Once you have designed and tested the radar, producing it should not cost much in terms of material. I assume 80% of the cost is R&D? If we promise ASELSAN we will be buying hundreds of them for F16, Kizilelma, ANKA and later also for KAAN of course, can we not get a good price, at least initially till KAAN production begins? If it is rather a production issue, why can we not use more materials, build a larger production facility, employ and train more people in the next years to increase production capacity? do we always need to think serially and react to needs instead of planning and arranging this things in advance? Finally, is it because we need to have permissions from L&M for different versions of F16? There is a lot of speculative info here.

TO SUM UP: If we have currently 230 F16s and we have the technology to upgrade them to ÖZGÜR II, we need to upgrade ALL (even if their remaining life is 10 years) ASAP. Anything else is not responsible behavior.
 
Messages
14
Reactions
22
Nation of residence
Turkey
Nation of origin
Turkey
The first flight of the P1 prototype is scheduled for April, but we haven't seen any information, statements, or indications from TUSAŞ regarding KAAN recently. I hope there won't be any problems or delays.
 

B_A

Contributor
Messages
1,126
Reactions
4 1,268
Nation of residence
Turkey
Nation of origin
Turkey
In July the GCAP partner governments agreed to try to make a contract with Edgewing by the end of 2025. There has been no announcement of this. Could be the partners cannot reach agreement and never will. Could be the partners cannot reach agreement yet. Could be the partner countries are in agreement but have yet to finalise a contract with Edgewing.

PS This is the KAAN thread so, no offence intended, I won't discuss GCAP more here except where it relates to KAAN.
The 5th gen version of Korean KAI KF-21 Boramae will far successful than Japan-UK one and become the a KAAN competitor
 

Spitfire9

Contributor
Think Tank Analyst
Messages
948
Reactions
14 1,232
Nation of residence
United Kingdom
Nation of origin
United Kingdom
The 5th gen version of Korean KAI KF-21 Boramae will far successful than Japan-UK one and become the a KAAN competitor
Different aircraft. GCAP is a 6G project. It is expected to be a large fighter with extremely long range. It will be much more expensive than KF-21. Yes, I expect KF-21 to sell in much larger numbers than GCAP.
 

B_A

Contributor
Messages
1,126
Reactions
4 1,268
Nation of residence
Turkey
Nation of origin
Turkey
Different aircraft. GCAP is a 6G project. It is expected to be a large fighter with extremely long range. It will be much more expensive than KF-21. Yes, I expect KF-21 to sell in much larger numbers than GCAP.
I knew they were different aircraft.

I meant that I didnt think GCAP would be a success.

You can see how many plans the Japanese promoted without many success since 2010s,like
Mitsubishi X-2 Shinshin or IHI Corporation XF9,First launch a massive publicity campaign for super weapon or super engine, then remain silent.

Unlike the Japanese, the Koreans quietly carried out their work, achieving victory after victory with the K2, K9, and KF21, much like Samsung and LG defeated Sony and Panasonic.
I don't know why the Japanese have become like this; now they're boasting about beating TSMC in the chip industry with 1/100 of the money.
 
Last edited by a moderator:

Spitfire9

Contributor
Think Tank Analyst
Messages
948
Reactions
14 1,232
Nation of residence
United Kingdom
Nation of origin
United Kingdom
I knew they were different aircraft.

I meant that I didnt think GCAP would be success.

You can see how many plans the Japanese promoted without many success since 2010s,like
Mitsubishi X-2 Shinshin or IHI Corporation XF9,First launch a massive publicity campaign for super weapon or super engine, then remain silent.

Unlike the Japanese, the Koreans quietly carried out their work, achieving victory after victory with the K2, K9, and KF21, much like Samsung and LG defeated Sony and Panasonic.
I don't know why the Japanese have become like this; now they're boasting about beating TSMC in the chip industry with 1/100 of the money.
From what I have recently read, GIGO (3 government GCAP organisation) is in advanced negotiations with Edgewing (3 country GCAP development and production company) to finalise a development contract. I assume a development contract will be announced this year. I am not sure how many the partner countries will take in total but I expect the number to be 350-400 with fewer ordered initially. Possible future customers: Saudi Arabia, UAE, Australia, Canada plus Germany if FCAS fails to launch, India if AMCA never gets going. Would you see total sales of 500+ GCAP over the next few decades as success?

I think that KAAN and KF-21 will sell widely when they can be offered with non-US engines.
 
Last edited:

B_A

Contributor
Messages
1,126
Reactions
4 1,268
Nation of residence
Turkey
Nation of origin
Turkey
From what I have recently read, GIGO (3 government GCAP organisation) is in advanced negotiations with Edgewing (3 country GCAP development and production company) to finalise a development contract. I assume a development contract will be announced this year. I am not sure how many the partner countries will take in total but I expect the number to be 350-400 with fewer ordered initially. Possible future customers: Saudi Arabia, UAE, Australia, Canada plus Germany if FCAS fails to launch, India if AMCA never gets going. Would you see total sales of 500+ GCAP over the next few decades as success?

I think that KAAN and KF-21 will sell widely when they can be offered with non-US engines.
I hope they would succeed (I have a very deep relationship with Japan and UK), and i see even 200-300 GCAP over the next few decades as a great success.

But the problem isnt the market. But it is the fact that Japan and Europe have performed poorly in many defense projects in recent years. Mitsubishi Space Jet and C2/P1, technical problems have been constantly arising.

If they successfully develop GCAP, the market is not a problem. Only Japan, UK and Italy will require no less than 400-500 units. (at least 300-400 for Japanese airforce alone)
 
Last edited by a moderator:

Brokengineer

Committed member
Messages
242
Reactions
1 497
Nation of residence
Turkey
Nation of origin
Turkey
Bro, that is on paper and in advertising propaganda information.
1. If it takes off vertically, its operational range is shortened so much that the whole process becomes almost futile. Increased mechanical complexity, reduced internal payload/fuel capacity, less range/endurance and higher fuel consumption during vertical manoeuvres, making it heavier and less capable in weight-limited scenarios.
It already has a disadvantage as it has to carry excess fuel to allow it to land vertically on carriers. To add another disadvantage is not very clever.

2. Operating from non-conformal positions (out in the wilderness or ”dispersed” as you say) will mean a lot of support equipment will have to be present in take off and landing sites. This causes logistical nightmares.
Your airforce land crews will have to be trained accordingly.
To a small and spread apart individual or a few units, you will have to provide the same number of equipment and ground crew that you would for a squadron or two in base.
Jack of all trades, Master of none.
 

Khagan1923

Contributor
Messages
1,190
Reactions
20 5,028
Nation of residence
Germany
Nation of origin
Turkey
KAAN's P1 prototype first flight has been revised to May or June this year. P2 first flight by the end of the year and P3 is either end of this year or the beginning of next year. Prototypes are going through ground tests for 2-3 months before first flights.

Maybe we were too harsh to Baklava man.

Demiroglu has been a complete disaster in this. This is the third or fourth time he gives a new date for the P1 and P2.

Look at this "Uçma tarihlerinden bahsediyorum yoksa prototipleri daha önce görünür hale getireceğiz."

The protoypes aren't even ready to be shown off meaning they haven't even completed assembly, yet we were told summer last year both were already in final assembly, lmao.

When I pointed this out some here were getting butthurt and throwing statements of officials as rebuttal in the fight.

Proven correct, again.
 

Khagan1923

Contributor
Messages
1,190
Reactions
20 5,028
Nation of residence
Germany
Nation of origin
Turkey
Oh also you can forget 2028 for first deliveries.

They won't deliver anything before 2030 and that is if everything goes optimal.

KF21 underwent 4 years of flight test after all their prototypes had been produced.

So more likely 2031-2032 for first deliveries.
 

uçuyorum

Contributor
Messages
1,164
Reactions
15 1,880
Nation of residence
Turkey
Nation of origin
Turkey
Maybe we were too harsh to Baklava man.

Demiroglu has been a complete disaster in this. This is the third or fourth time he gives a new date for the P1 and P2.

Look at this "Uçma tarihlerinden bahsediyorum yoksa prototipleri daha önce görünür hale getireceğiz."

The protoypes aren't even ready to be shown off meaning they haven't even completed assembly, yet we were told summer last year both were already in final assembly, lmao.

When I pointed this out some here were getting butthurt and throwing statements of officials as rebuttal in the fight.

Proven correct, again.
Im quite happy, delay by couple months is ok
 

Zafer

Experienced member
Messages
5,192
Reactions
14 8,034
Nation of residence
Turkey
Nation of origin
Turkey
Making a fighter jet plane is not childs' play, it is very welcome to only have delayed the first flight by a couple of months, people should get used to it and stop moaning.
 

Fairon

Contributor
Messages
483
Reactions
6 1,213
Nation of residence
Turkey
Nation of origin
Turkey
Maybe we were too harsh to Baklava man.

Demiroglu has been a complete disaster in this. This is the third or fourth time he gives a new date for the P1 and P2.

Look at this "Uçma tarihlerinden bahsediyorum yoksa prototipleri daha önce görünür hale getireceğiz."

The protoypes aren't even ready to be shown off meaning they haven't even completed assembly, yet we were told summer last year both were already in final assembly, lmao.

When I pointed this out some here were getting butthurt and throwing statements of officials as rebuttal in the fight.

Proven correct, again.

Maybe, but on the other hand, during the baklava man era, TUSAŞ employees couldn’t see their families for long periods of time probably due to the pressure of meeting his deadlines.(to be fair, this choice always reflected as voluntariliy, not forced)

Yes we need KAAN as soon as possible and it is one of the top most important project for us but we also need to prevent burning out these nameless heroes.

Maybe this is the sweetspot. Yes there maybe delays or longer deadlines than previous era but this is a much healthy work enviorement than before as well.

(This is just my guess, by the way. I don’t actually know the working conditions at TUSAŞ, past or present. I’m just picking this up from the press statements, speeches etc)
 

Fuzuli NL

Experienced member
Germany Correspondent
Messages
3,417
Reactions
46 9,586
Nation of residence
Germany
Nation of origin
Turkey
All the hard work and sacrifices made by TAI's amazing teams and management, all the ground-breaking achievements in multiple fronts (Jets, propellers, UAVs, Space, Engines), the sheer pressure of simultaneously run projects and deliveries, all the maiden flights they realised in record times, add to that being relatively new in the game and up against behemoths in the field, yet securing multiple export contracts including the recent Hürjet one with Spain...

All this is nothing for some "experts" here, who are moaning about delivery date delays and that the previous estimations are a little off!
Disrespectful and laughably pathetic!
 

boredaf

Experienced member
Messages
1,967
Solutions
1
Reactions
36 5,798
Nation of residence
United Kingdom
Nation of origin
Turkey
Maybe, but on the other hand, during the baklava man era, TUSAŞ employees couldn’t see their families for long periods of time probably due to the pressure of meeting his deadlines.(to be fair, this choice always reflected as voluntariliy, not forced)

Yes we need KAAN as soon as possible and it is one of the top most important project for us but we also need to prevent burning out these nameless heroes.

Maybe this is the sweetspot. Yes there maybe delays or longer deadlines than previous era but this is a much healthy work enviorement than before as well.

(This is just my guess, by the way. I don’t actually know the working conditions at TUSAŞ, past or present. I’m just picking this up from the press statements, speeches etc)
Couldn't agree more, and, I would much rather people in charge of these project keep their feet firmly on the ground and give realistic dates, instead of constantly repeating dates that serve no purpose other than propaganda.

Another date also given in that interview is 2032 for TF35K for it to be installed on Kaan, and the statement doesn't mention deliveries or anything, just integration to Kaan. That is far more realistic than the previously mentioned dates as well. I wonder if some people will eat some humble pie about the shite they talked over and over again now.
 

Yasar_TR

Experienced member
Staff member
Administrator
Messages
3,858
Reactions
228 20,006
Nation of residence
United Kingdom
Nation of origin
Turkey
Postponing previously given first flight dates without explanation is totally unprofessional.

Remember Mahmut Aksit, when TF6000 was delayed by 6 months he came clean and stated that a simple part that was available normally, was made unavailable. So they had to produce it in house, causing the delay.

Mr Demiroglu initially had given a First flight date of last quarter of 2025. Then he postponed it to beginning of April 2026, without any reasons. That was 3 months to 6 months delay at best and at worst over the previously given date. Now another couple of months delay! No explanation again. This is becoming the norm and a joke!

In production delays may occur. In development work they may be even more frequent. But there is always an explainable reason. For a program like KAAN, that is being followed by everyone in close scrutiny, to just postpone is wrong.

We have a saying in Turkish ; (Gelen gldeni arattırır) . I guess the closest translation is “the better the devil you know”.
Kotil was at least “closer” to being a man of his word.
 

AlperTunga

Active member
Messages
132
Reactions
2 150
Nation of residence
Switzerland
Nation of origin
Turkey
Maybe, but on the other hand, during the baklava man era, TUSAŞ employees couldn’t see their families for long periods of time probably due to the pressure of meeting his deadlines.(to be fair, this choice always reflected as voluntariliy, not forced)

Yes we need KAAN as soon as possible and it is one of the top most important project for us but we also need to prevent burning out these nameless heroes.

Maybe this is the sweetspot. Yes there maybe delays or longer deadlines than previous era but this is a much healthy work enviorement than before as well.

(This is just my guess, by the way. I don’t actually know the working conditions at TUSAŞ, past or present. I’m just picking this up from the press statements, speeches etc)
Believe me if you reward those nameless heroes appropriately, they‘d be more than happy to do this for a few years.
 

Follow us on social media

Top Bottom