• Forum restore complete (see latest announcement thread)

TR Attack & Utility Helicopter Programs

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
T129, T625 and T70 all have plenty of major foreign subcomponents in them. None of these deliveries can ever be secret.
Furthermore, MSB does weekly press conferences talking about recent events, exercises and new stuff added to inventory. That's how most of defence media literally learns about deliveries. They usually don't give any numbers and this is a good thing, but all systems are mentioned unless it's actually secretive. Some recent ones:
From last week:
"The locally-powered Vuran vehicle, Armored Anti-Tank Vehicle-UMTAS CİRİT / Tracked (ZTA-UC/P) weapon system, Inspection and acceptance activities of the tactical UAV system were completed."

January 18:
"The inspection and acceptance activities of various quantities of "Medium Range Modern Anti-Tank Missile-OMTAS" and "Long Range Acoustic System" were completed by the Turkish Land Forces Command."

January 4:
"The inspection and acceptance activities of various quantities of "Mini Smart Ammunition", "Electronic Attack System MİLKAR" and "Hisar-O Missile" were completed by the Turkish Land Forces Command.

November 30:
"Six Armored Wheeled Vehicle Rescuers, which were planned to be procured under the Tactical Wheeled Vehicles Project, were taken into the inventory of the Turkish Land Forces on November 27."

November 23:
"2 Basic Training Helicopters[AW109T], 4 Mobile Mortar Detection Radars, 8 Armored Anti-Tank Vehicles, 17 Armored Fighting Vehicles with NEFER Turrets, 1 Vehicle Mines / Handmade Explosive Detector were taken into the inventory of the Land Forces Command."
 

Merzifonlu

Contributor
Think Tank Analyst
DefenceHub Diplomat
Messages
814
Reactions
28 2,496
Nation of residence
Turkey
Nation of origin
Turkey
Why were Gökbey deliveries delayed? Did Gendarmerie General Command dislike the first 3 Gökbey helicopters delivered and asked for modifications?
 

Zafer

Experienced member
Messages
5,650
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
While there is so much intricacies around defense sector it is only natural to be selective in what you make known. Every move you make is closely watched by enemies and also friends. Impatiently.
 
Last edited:

Saithan

Experienced member
Moderator
Denmark Correspondent
DefenceHub Diplomat
Messages
9,843
Reactions
65 21,984
Nation of residence
Denmark
Nation of origin
Turkey
It's important to announce deliveries and such. If we have been reduced to keeping these things secret then that means we've regressed.

If I announce to the world that we delivered 200 Cakir and Atmaca, who's to say that number isn't 20000 of each. But if I can't event announce delivery because I've grown paranoid. Then people should be worried of the government spending TSK money elsewhere.

If you're worried about revealing such things, then you should at least ensure and do hardcore PR spending 1 billion USD on the progress on all publicly available projects.

Meaning showing and performing cirkus act of flying Gökbey around 700h is nothing. we want to see those number double up every year.

Just like how Baykar was smart enough to promote flighthours of TB2. Trust is everything, if you can't trust your government and officials to be upfront with their own people then there is no future.
 

uçuyorum

Contributor
Messages
1,224
Reactions
15 1,988
Nation of residence
Turkey
Nation of origin
Turkey
It's important to announce deliveries and such. If we have been reduced to keeping these things secret then that means we've regressed.

If I announce to the world that we delivered 200 Cakir and Atmaca, who's to say that number isn't 20000 of each. But if I can't event announce delivery because I've grown paranoid. Then people should be worried of the government spending TSK money elsewhere.

If you're worried about revealing such things, then you should at least ensure and do hardcore PR spending 1 billion USD on the progress on all publicly available projects.

Meaning showing and performing cirkus act of flying Gökbey around 700h is nothing. we want to see those number double up every year.

Just like how Baykar was smart enough to promote flighthours of TB2. Trust is everything, if you can't trust your government and officials to be upfront with their own people then there is no future.
If you were to produce that many just the raw materials you order and the scale of what you do would be easy to track for any intelligence organization
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
While there is so much intricacies around defense sector it is only natural to be selective in what you make known. Every move you make is closely watched by enemies and also friends. Impatiently.
Yes, but a light general duty helicopter that will be given to a semi civilian agency is not such a system.
 

Saithan

Experienced member
Moderator
Denmark Correspondent
DefenceHub Diplomat
Messages
9,843
Reactions
65 21,984
Nation of residence
Denmark
Nation of origin
Turkey
If you were to produce that many just the raw materials you order and the scale of what you do would be easy to track for any intelligence organization
Those were just example. But I hope you got my point.
 

Zafer

Experienced member
Messages
5,650
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
Yes, but a light general duty helicopter that will be given to a semi civilian agency is not such a system.
Not when this helicopter can be remade to operate on a carrier ship. There maybe issues about how many engines you can procure in a given period of time and the maker may want to keep those engines for some other customer while the domestic replacement engine is being prepared for the task. I would say we need to have faith in our industrialists and stop making a big deal out of nothing.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
Not when this helicopter can be remade to operate on a carrier ship.
Is this navalized helicopter is in the same room with us? We are not talking about future T625Ns for navy, we are talking about civilian T625s that were produced at least 2 years ago and are yet to be delivered to gendarme. We first saw J-6001 in 2022. A 2 year delay for a serial production aircraft is not nothing. This aircraft was to be delivered to gendarme in Q1 2023, which was already a delayed date, because first 3 T625s were to be delivered to gendarme in 2022. Going even further, originally first delivery was to be made in Q4 2021, which was later updated to 1 T625 by H2 2022, which was later revised to first delivery in Q1 2023, then revised to Q4 2023, and we currently do not have any dates.

"The first batch of 3 helicopters is expected to be delivered in 2022. The delivery date for the T625 GÖKBEY was previously planned as October 29, 2021, which was later updated as 'mid-2022'."

"Kotil announced that they will deliver the first GÖKBEY helicopter to the Gendarmerie General Command towards the end of 2022."

I get that you like to be optimistic and usually take the words from appointees as gospel, but there's a fine line between being optimistic and too optimistic for his
own good. I guess I'll be the bad guy again, but that's fine. There are some big delays in this program for the last 3 years and we don't know the cause of those delays because like rest of the media, most of the defence media is also just a bunch of propagandists that are too scared of asking questions for the fear of being put out of the ecosystem and losing their access. Those that do question things are shunned and forced to stay away, being called traitors even for asking questions. So all we get is continuous delays and revised delivery dates with no accountability whatsoever while we are hurting heavily for utility helicopters and our pilots still use UH-1s.
 

Zafer

Experienced member
Messages
5,650
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
Is this navalized helicopter is in the same room with us? We are not talking about future T625Ns for navy, we are talking about civilian T625s that were produced at least 2 years ago and are yet to be delivered to gendarme. We first saw J-6001 in 2022. A 2 year delay for a serial production aircraft is not nothing. This aircraft was to be delivered to gendarme in Q1 2023, which was already a delayed date, because first 3 T625s were to be delivered to gendarme in 2022. Going even further, originally first delivery was to be made in Q4 2021, which was later updated to 1 T625 by H2 2022, which was later revised to first delivery in Q1 2023, then revised to Q4 2023, and we currently do not have any dates.

"The first batch of 3 helicopters is expected to be delivered in 2022. The delivery date for the T625 GÖKBEY was previously planned as October 29, 2021, which was later updated as 'mid-2022'."

"Kotil announced that they will deliver the first GÖKBEY helicopter to the Gendarmerie General Command towards the end of 2022."

I get that you like to be optimistic and usually take the words from appointees as gospel, but there's a fine line between being optimistic and too optimistic for his
own good. I guess I'll be the bad guy again, but that's fine. There are some big delays in this program for the last 3 years and we don't know the cause of those delays because like rest of the media, most of the defence media is also just a bunch of propagandists that are too scared of asking questions for the fear of being put out of the ecosystem and losing their access. Those that do question things are shunned and forced to stay away, being called traitors even for asking questions. So all we get is continuous delays and revised delivery dates with no accountability whatsoever while we are hurting heavily for utility helicopters and our pilots still use UH-1s.
You don't get it. It is perfectly OK to be behind schedule when you don't have all the ecosystem elements locally made for many years. Mind you we are at only 80% local made at this point. The remaining 20% can drag you quite a bit. You need to navigate your way around obstacles and make the most of what you have at the moment you do your planning.

Talking about Gökbey I am talking about its engines, if you will need to give engines to the marines you need to take it from the gendarmerie which is the easiest of all the forces. This is considering the engines may be scarce.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
You don't get it. It is perfectly OK to be behind schedule when you don't have all the ecosystem elements locally made for many years. Mind you we are at only 80% local made at this point. The remaining 20% can drag you quite a bit. You need to navigate your way around obstacles and make the most of what you have at the moment you do your planning.

Talking about Gökbey I am talking about its engines, if you will need to give engines to the marines you need to take it from the gendarmerie which is the easiest of all the forces. This is considering the engines may be scarce.
We will never be 100% and we don't need to be 100%. Literally no weapon system or platform we have are 100% local and they will never be. We still have plenty of projects that do have foreign components and are in fact in the inventory. All TB2s have foreign components, even more than Anka itself, and they sell like hot cakes. All MAMs as well, they also sell like hot cakes and are built continuously. We have 300+ STAs in service and they all have foreign powerpacks. Sometimes it's not embargoes, sometimes it's just bad to horrible project planning and missed delivery dates.

If you want to believe that the same TAI that can't deliver a light utility helicopter to gendarmerie in 3 years with a set contract is working behind everyone's back to navalize the same helicopter with the engines for gendarmerie ones, without a contract for DzKK, be my guest.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
Army already had plenty of drone projects for future as well, and also with drone-helicopter teaming. But yes, they probably mostly think that the time of scout helicopter is over when there's a proliferation of SHORADs over the world. Remember droves of Russian Mis being shot down while flying low in the first months of the war. Lessons to be learned.
Quoting this from US' cancellation of FARA.

Even with all this however, having 6 times the attack helicopters unlike before and them being vulnerable, KKK looks to be still very much interested in T629 according to everything that has been said so far.
With KKK's interest in T629 being very high, is this the best course of action for future army aviation. T629 is not a big helicopter, it will still be hard to develop mission profiles for it as it will have a lower MTOW compared to purebred attack helicopters. And T929 is on the backburner.


US is reshuffling their helicopter programs but we can't?
Reshuffle to what? Gendarmerie, army and navy all need utility helicopters. Gendarmerie already placed an order because they have the oldest fleet of utility helicopters, and gendarmerie's number of roles and missions increase every passing day in and outside the country. T70 deliveries doesn't look like will continue after 40+ units. JnGK alone was supposed to get 30 T70s to replace its 30 year old S70s, now it's not clear if there will be a total delivery of more than 40 units with the latest delays. How do we supply them with new helicopters?

T625 in its current state is a semi civilian helicopter with some bare bones avionics and self defense suite for military roles. It'd be a pretty good fit for low threat gendarmerie environments at the moment, saving the S70s and new T70s for missions in hotter areas. Which is exactly why JnGK was its first customer. So that it could mature while being in use with JnGK.
 

Zafer

Experienced member
Messages
5,650
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey

From the link
"We absolutely are paying attention [to world events] and adjusting, because we could go to war tonight, this weekend,” head of Army Futures Command Gen. James Rainey told reporters at the Pentagon on Thursday.

What we need keeps changing day by day.
 

boredaf

Experienced member
Messages
2,265
Solutions
1
Reactions
42 6,641
Nation of residence
United Kingdom
Nation of origin
Turkey
US apparently cancelled their new attack/recon helicopter program in favour of drones and space based surveillance systems:


Shame, I really liked the look of Sikorsky Raider X. This means only new acquisition, I think, will be new Bell V-280 for the US. I wonder if we are also changing our minds about helicopter projects as well.
 

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
5,137
Reactions
104 10,044
Nation of residence
Bangladesh
Nation of origin
Bangladesh
"We are learning from the battlefield – especially in Ukraine – that aerial reconnaissance has fundamentally changed," Chief of Staff of the Army Gen. Randy George said in a statement accompanying the announcement. "Sensors and weapons mounted on a variety of unmanned systems and in space are more ubiquitous, further reaching, and more inexpensive than ever before. I am confident the Army can deliver for the Joint Force, both in the priority theater and around the globe, by accelerating innovation, procurement and fielding of modern unmanned aircraft systems, including the Future Tactical Unmanned Aircraft System, Launched Effects, and commercial small unmanned aircraft systems."





I think it is important to understand what is going on here before we reach any definitive conclusions.

See that, FARA was set to replace OH-58 Kiowa. Both are primarily reconnaissance platforms with limited attack capability. It was supposed to complement AH-64E and increase the tactical ISR capability of the field commanders.

Now, turns out, these type of UAV systems (see below) are more efficient when it comes to increasing tactical ISR capability.

1707498775631.png

1707498810667.png


See, FARA is much more expensive and complex system to manufacture. However, as a very fast & highly maneuverable rotary-wing platform (coupled with its inbuilt countermeasures) it is more survivable than these types of tactical UAV. But, simply not survivable enough to justify its cost and expense. On the other hand, these tactical UAVs are far more cost effective and simpler to built, hence highly attritable.

In essense, US army is trading moderate survivability of limited numbers of expensive FARA, with far higher attritability of large numbers of cost effective future tactical unmanned aircraft system. (Even though FARA can carry more sophisticated & longer range sensor payload, future tactical UAS program will compensate for that by fielding higher numbers of platforms and distributing them cross the battlefield.) This is a very good trade-off.

And today's networking revolution & increasing sensor to shooter connectivity has decreased the need to mount firepower and sensor package on the same platform. Hence, wherever feasible (by prioritising modularity, cost effectiveness & ease of manufacturing) more and more simpler, separate sensor and shooter platforms are being built.

However, it does not necessarily always negate the need of combining sensor package & heavy weapons in a single expensive platform. In fact, those are also imperative in highly contested battefield and combat scenarios.

In that same spirit, heavy attack helicopters will continue to have its relevance as the primary rotary-wing heavy CAS platforms. (Note that, just 9 months ago US Army has ordered 184x latest variant of AH64E.)

Firstly, we know that AH-64 used to be an excellent ISR asset. (It still is) As it was more survivable as a low flying, highly maneuverable rortaty-wing platform compared high flying slow non-maneuverable large drones like MQ-9. Which are more vulnerable to medium and long range AD than AH-64. But now with small and highly attritable UAVs like ORLAN-30 or RQ-21B flying over the treeline without worrying much about being shot down, largely negate that unique advantage that AH-64 provided previously.

However, where heavy attack helicopters like Apache or T929 is really unmatched, is in their ability to very rapidly concentrated heavy (direct & indirect) firepower at a time and place of necessity or commander's choosing.

That can be largely understood in three ways.

*Scenario No.1– Let's say you have lots of UAV sensoring all over the battlefield and it is totally transparent to you. Also, you have capable UAV to artillery (sensor to shooter) networking. However, you are defending a large area where you don't have sufficient numbers of tanks & IFVs (close combat platforms) to cover all the potential axis of enemy advance. (Now, artillery is very lethal when it comes to stopping enemy advance. However, it is not always sufficient nor can it replace the need for direct combat platforms. I.e. tanks & IFV.) Let's suppose with UAV sensoring you discover a rapid enemy mechanized & armored thrust through an unexpected axis of advance. Where you don't have sufficient direct combat platforms (tanks & IFVs) of your own. And artillery may not be enough here to completely halt the enemy thrust. So, what can you do? By the time you call in your mechanized and armored untis from other sectors in an hour, enemy penetration has been achieved already and serious damage is done. So, you call in your 'flying tanks', which will reach the area within 10 minutes and by engaging the enemy with heavy firepower, will buy you some very critical time until armored & mechanized units reaches there.

Scenario No. 2– Remember that Ukrainian assault in early week of the counter offensive with Bradleys & leopards that ended in disaster? Leading such assault against a prepared enemy with heavy attack helicopters In a combined arms manner will increase the chances of success and inflict more damage on the enemy. When treversing such highly prepared defesive line, attack helicopters are not vulnerable to mines, dragon's teeth, anti armor trenches & artillery like th way tanks & IFVs are. It offers greater flexibility and freedom of maneuver with tank like firepower in such restricted scenario. (Specially if it comes equipped with DIRCM.)

3. Scenario No. 3– As a security element for the mainbody, attack helicopters offer higher flexibility compared to ground units becaues of their ability to cover large areas in a short timespan. This is very useful when conducting screening and guarding tasks. Let's say you want to advance rapidly through an avenue. Yet you don't have the time nor enough ground unit resources to set up sufficient flanking security forces along the way. So, you task these 'flying tanks' to provide security for your mainbody.


Large UAVs (even though can carry heavy firepower) can't perform these tasks the same way these rotary-wing platforms can do. As they are high-flying, slow, non-maneuverable platforms. Hence highly vulnerable to MRSAMs & LRSAM.

Thus ultimately my conclusion is, T929 is still a very relevant project for TSK,
 
Last edited:

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
4,181
Reactions
125 19,013
Nation of residence
Turkey
Nation of origin
Turkey
attritable
We will keep hearing this word until we are sick of it, and I'm here for it.

Thus ultimately my conclusion is, T929 is still a very relevant project for TSK
I think so as well. Minor issue though, we don't have the engines to build it and maybe to even develop it, hence the backburner.
 

Follow us on social media

Top Bottom