Our boy Ada-class has come a long way
And here she is as promised. I see the 76mm gun, AKR-D for the gun, MAR-D radar, Ahtapot Denizgözü EO system, with LPI radars at the mast and aft and an ESM system.TCG Akhisar is set to start its testing phase next month.
And here she is as promised. I see the 76mm gun, AKR-D for the gun, MAR-D radar, Ahtapot Denizgözü EO system, with LPI radars at the mast and aft and an ESM system.
Doubting if it has anything to do with unirobotics, stamp still takes its place on I-class and TF-2000. Unirobotics has failed big time and let all wait and see if it will go public. It was planned for ADKG but from this point on, i have got a feeling that stamp may take its place.
Fun fact; Unirobotics' mere strong hand was few high ups in ASFAT, all replaced by proper people with the change in power and care to check who is the GM of ASFAT nowadays. I will give a tip, he is from Aselsan.
Unirobotics didn't complete the harbor acceptance tests on time and didn't complete the majority of the tests required to accept the system.Looks like they went with Unirobotics.
You frequent here so I thought you would know, anyways 3 ships in construction and 4 more to follow for istifs, and TF2000 has gone through a lot of design iterations but we have been hearing any day now for the finalisation of design and start of constructionWhat are the plans for further Istanbul class ships for the Turkish Navy?
How far is the design phase of the Turkish destroyers, the TCG Anadolu does not need to go to foreign waters if it does not have a decent escort for air defense, ship and anti-submarine warfare.
Let alone exert pressure on the Black Sea and the Mediterranean.
Just to add and correct if I may :You frequent here so I thought you would know, anyways 3 ships in construction and 4 more to follow for istifs, and TF2000 has gone through a lot of design iterations but we have been hearing any day now for the finalisation of design and start of construction
It wasn't Erdogan's busy schedule, TF-2000's steel cutting wasn't meant to be done at the date Naval Insider had made up .Just to add and correct if I may :
Milgem project as we know it stands at 12 ships;
Ships consisting of 4 Ada Class corvettes and are, no 1 to 4
Ship No 5 is TCG Istanbul
Ships No 6 to 8 are under construction and will be finished all together.
Ships No 9 and 10 have had their steel cutting. (See no 10 pic below)
Ships No 11 and 12 were awaiting steel cutting.
View attachment 72672
Yeni İstif sınıfı fırkateynin inşasına başlandı!
Bu yılın 1 Temmuz Denizcilik ve Kabotaj Bayramı, Türk deniz sanayiinin gurur verici bir başarısı ile taçlandı. Türkiye'nin denizcilik sanayisindeki başarısını bir kez daha gözler önüne seren, TCG İzmit sonrası yapılacak olan 10 numaralı istif sınıfı fırkateynin sac kesim töreni gerçekleştirildi.www.defenceturk.net
TF2000 destroyer is awaiting steel cutting, unless more design changes are implemented. As it stands the construction work program has been officially launched by Asfat. Steel cutting ceremony was arranged. But RTE had to postpone it due to his busy personal program.
quote:
According to information published by ASFAT on September 20, 2024, Turkey has officially launched the construction of its first domestically designed and produced air defense destroyer, the TF-2000.
unquote.
Turkish firm begins construction of its first indigenous Air Defense Destroyer TF-2000
Turkish company initiates construction of its first domestically designed TF-2000 Air Defense Destroyer.armyrecognition.com
Do you know the reason why they want to place only one NAZAR DIRCM? Is it because of the power output of the generators?It wasn't Erdogan's busy schedule, TF-2000's steel cutting wasn't meant to be done at the date Naval Insider had made up .
TF-2000's design is maturing after changes, it may take time.
Within the last year, IIRC, the idea of an in-between class of 4K-5K hull resurfaced (or that was the impression I got from defense circles).Just to add and correct if I may :
Milgem project as we know it stands at 12 ships;
Ships consisting of 4 Ada Class corvettes and are, no 1 to 4
Ship No 5 is TCG Istanbul
Ships No 6 to 8 are under construction and will be finished all together.
Ships No 9 and 10 have had their steel cutting. (See no 10 pic below)
Ships No 11 and 12 were awaiting steel cutting.
View attachment 72672
Yeni İstif sınıfı fırkateynin inşasına başlandı!
Bu yılın 1 Temmuz Denizcilik ve Kabotaj Bayramı, Türk deniz sanayiinin gurur verici bir başarısı ile taçlandı. Türkiye'nin denizcilik sanayisindeki başarısını bir kez daha gözler önüne seren, TCG İzmit sonrası yapılacak olan 10 numaralı istif sınıfı fırkateynin sac kesim töreni gerçekleştirildi.www.defenceturk.net
TF2000 destroyer is awaiting steel cutting, unless more design changes are implemented. As it stands the construction work program has been officially launched by Asfat. Steel cutting ceremony was arranged. But RTE had to postpone it due to his busy personal program.
quote:
According to information published by ASFAT on September 20, 2024, Turkey has officially launched the construction of its first domestically designed and produced air defense destroyer, the TF-2000.
unquote.
Turkish firm begins construction of its first indigenous Air Defense Destroyer TF-2000
Turkish company initiates construction of its first domestically designed TF-2000 Air Defense Destroyer.armyrecognition.com
I think your question about the 4K to 5K hull, would best be answered by @Anmdt.Within the last year, IIRC, the idea of an in-between class of 4K-5K hull resurfaced (or that was the impression I got from defense circles).
Are there any developments regarding this project or is there even any intension, say like, make a lighter version of TF2000 around 6-7K tons that would completely meet all mission requirements and fill the gap comfortably between İstif class and TF2000?
edit:
Main mission is to keep up with TCG Anadolu and TF2000 on open seas and fulfilling all mission profiles necessary to perform independent fleet actions.